Site start
Housing site start — Dalkey
Dalkey, Dublin
1 commencement notice · start date 12 Nov 2021 · planning reference given
Planning D19A0749. PL06D306919
- Commencement notices
- 1
- Latest start date
- 12 Nov 2021
- Latest notice
- 1 house
- Planning reference
- D19A0749.PL06D306919
- Location
- Dalkey, Dublin
Location
Where the site is
- Area
- Dalkey, Dublin
- County
- Dublin
Addresses on the notices
- Clanaber Torca Road
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The construction of a new dwelling at Clanaber Torca Road. The development will consist of: (a) Construction of a two storey above lower ground floor detached dwelling. (b) Repositioning and widening of an existing vehicular entrance to the southwest of the property onto the private road which adjoins Torca Road. (c) The construction of new boundary walls including a new wall along the road frontage. (d) The demolition of the existing detached house and associated outbuildings. (e) Associated drainage and landscaping works within the curtilage of the site.
Floor area stated for this source: 156 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.