Site start

Commercial site start — Dublin

Dublin

4 commencement notices · latest start date 06 Nov 2020 · planning reference given

Planning D19A/0662 · Planning application

View full project timeline

Commencement notices
4
Latest start date
06 Nov 2020
Latest notice
33 m²
Planning reference
D19A/0662
Location
West Courtyard, Belfield Office Park, Dublin

Location

Where the site is

Area
Dublin
County
Dublin

Addresses on the notices

  • West Courtyard, Belfield Office Park, Dublin
  • East Courtyard, Belfield Office Park, Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

The Garden Pavilion is a small single storey building, located in the East Courtyard, Belfield Office Park, Clonskeagh, Dublin 14

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 33 m².

Planning reference D19A/0662
Notice 2 Commencement notice (owner-supplied)

Minor material alterations with the opening up of the section of car park below to the west courtyard. All other areas will remain unchanged from the previously granted fire safety certificate 97 /8235. Upper Basement, West Courtyard, Belfield Office Park, Clonskeagh, Dublin 14

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 179 m².

Planning reference D19A/0662
Notice 3 Commencement notice (owner-supplied)

Construction of a new building - Pod 2 is a small single storey building, located in the East Courtyard which will be used as a meeting space. Pod 2, East Courtyard, Belfield Office Park, Clonskeagh, Dublin 14

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 33 m².

Planning reference D19A/0662
Notice 4 Commencement notice

Construction of new building - Pod 1 is a small single storey building, located in the East Courtyard, which will be used as a meeting space. Pod 1 East Courtyard, Belfield Office Park, Clonskeagh, Dublin 14

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 33 m².

Planning reference D19A/0662

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.