Site start

Housing site start — Naas

Naas, Kildare

1 commencement notice · start date 24 Sep 2021 · planning reference given

Planning 19513 · Planning application · Council file · external

View full project timeline

Commencement notices
1
Latest start date
24 Sep 2021
Latest notice
1 house
Planning reference
19513
Location
Naas, Kildare

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
1
Completion certificates
0

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Naas, Kildare
County
Kildare

Addresses on the notices

  • first floor level
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Kildare County Council planning record Application details, status and decision record for 19513. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

1. Remove the existing defective roof to the front section of the house and replace with new hipped , concrete tile roof including 3 no. rooflights. 2. Construct new zinc clad first floor link between rear and front sections of the house adding 24m2 of additional floor space at first floor level. 3. Modifications to existing external windows and doors to front section of the house. 4. Removal of scrub planting to Dublin road boundary and completion of partially built existing 2.2m high blockwork wall and cladding of this wall with selected stone. 5. Increase height of entrance gates to match new wall height. 6. Installation of 28m2 of PV Solar Panels to the south western roof face of the existing rear section of the house.

Work stated for this notice 1 house Explicit phase quantity stated by the source.

Floor area stated for this source: 120 m².

Planning reference 19513

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.