Site start
Housing site start — Shankill
Shankill, Dublin
1 commencement notice · start date 29 Sep 2024 · planning reference given
Planning D22A/0853 & D24A/0812WEB
- Commencement notices
- 1
- Latest start date
- 29 Sep 2024
- Latest notice
- 148 m²
- Planning reference
- D22A/0853
- Location
- Shankill, Dublin
Location
Where the site is
- Area
- Shankill, Dublin
- County
- Dublin
Addresses on the notices
- roof level, comprising 4 no
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The construction of one 2-storey and single storey dwelling with dormer window at roof level, comprising 4 no. bedrooms and associated living, dining & utility spaces, served by a wastewater treatment plant and polishing filter, 1 no. single-storey office room, the provision of all associated ground and landscape works, the repositioning of existing gate to property, the widening of existing adjacent laneway and widening of existing shared vehicle gateway to Lordello Road.
Floor area stated for this source: 148 m².
Source unit value with scope not stated: 1 unit. It is not presented as notice-specific scale.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.