Commencement notice group
Housing commencement notices — Dublin
Dublin 18, Dublin
1 separate notice · latest notified commencement 09 Aug 2019 · planning reference supplied
- Source notices
- 1
- Latest notified commencement
- 09 Aug 2019
- Latest notice
- 431 units
- Planning references supplied
- DZ17A/0862
- Public location
- Dublin 18, Dublin
Public source geography
Site location
- Public site / locality
- Dublin 18, Dublin
- County
- Dublin
Public site labels seen across the notices
- TC2, Cherrywood, Dublin 18
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction of two mixed use blocks situated over a shared basement level (basement / podium previously commenced BCMS Ref: 8417855), TC2 Blocks C1 and C2, containing a total of 431 apartment units, associated common areas and communal facilities to include fitness centre and creche, retail units, landscaping works to include public realm works and the construction of a central common space and two shared courtyards, at TC2, Cherrywood, Dublin 18.
431 units · 94,790 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.