Site start
Building extension site start — Dublin
Dublin
1 commencement notice · start date 07 Feb 2022 · planning reference given
Planning 1832/20
- Commencement notices
- 1
- Latest start date
- 07 Feb 2022
- Latest notice
- 19 m²
- Planning reference
- 1832/20
- Location
- Dublin
Location
Where the site is
- Area
- Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
83 Rialto Cottages, removal of existing single-storey rear extension and construction of a new single-storey rear extension (b) attic conversion to habitable room with rear dormer construction beneath existing ridge line and existing ground floor level to be reduced down to accommodate building regulations; (c) renovation and alterations to the existing building including all associated ancillary site works
Floor area stated for this source: 19 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.