Commencement notice group
Housing commencement notices — Gorey
Gorey, Wexford
7 unique commencement events · latest notified commencement 17 Mar 2025 · planning reference supplied
- Unique commencement events
- 7
- Latest notified commencement
- 17 Mar 2025
- Latest notice
- 151 m²
- Planning references supplied
- 20211321
- Public location
- Gorey, Wexford
Public source geography
Site location
- Public site / locality
- Gorey, Wexford
- County
- Wexford
Public site labels seen across the notices
- Coill na Giuise, Ballytegan Road, Gorey, Co Wexford
- Coill na Giuise, Ballytegan Road, Gorey, Wexford
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Wexford County Council planning record Application details, status and decision record for 20211321. Official council planning portal Verified official link Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Constuction of a Creche (Shell & Core) and all associated site works at Coill na Giuise, Ballytegan Road, Gorey, Co Wexford
Floor area stated for this source: 151 m².
2 No Units (Houses 73 & 74 - 3 Bed Semi-Detached House Type B & D) and associated site works
Floor area stated for this source: 219 m².
10 No Units (Block E - Phase 3) consisting of a) 5 no 2-Bed Apartments Type H b) 5 no 3-Bed Duplexes Type J and all associated site work
Floor area stated for this source: 967 m².
10 No Units (Block D - Phase 3) consisting of a) 5 no 2-Bed Apartments Type H b) 5 no 3-Bed Duplexes Type J and all associated site works
Floor area stated for this source: 967 m².
21 No Units (Houses 61/62, 85/86 & Block C - Phase 2B) consisting of a) 2 No 3-Bed Semi Detached House Type B, b) 2 No 3-Bed Semi Detached House Type D, c) 3 no 1-Bed Apartments Type E, d) 8 no 2-Bed Apartments Type E, K & F1, e) 3 no 3-Bed Houses Type F, f) 2 no 4-Bed Houses Type G, g) 1 no 3-Bed Duplex Type K1 and all associated site works
Floor area stated for this source: 3,501 m².
Blocks A & B (16 No Units - Phase 2A) consisting of a) 8 no 2-Bed Apartments Type K & F1, b) 4 no 3-Bed Houses Type F, c) 4 no 3-Bed Duplexes Type K1 and all associated site works at Coill na Giuise, Ballytegan Road, Gorey, Wexford
Floor area stated for this source: 1,540 m².
Overall development total stated in source: 53 houses.
27 No Units (Phase 1A) consisting of a) 3 no 4-Bed Detached House Type A, b) 11 no 3-Bed Semi Detached House Type B, c) 8 no 3-Bed Semi Detached House Type C, d) 5 no 3-Bed Semi Detached House Type D and all associated site works
Floor area stated for this source: 3,050 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.