Commencement notice group
Housing commencement notices — Donard
Donard, Wicklow
1 unique commencement event · latest notified commencement 12 Dec 2025 · planning reference supplied
- Unique commencement events
- 1
- Latest notified commencement
- 12 Dec 2025
- Latest notice
- 14 houses
- Planning references supplied
- 2460292
- Public location
- Donard, Wicklow
Verified record connections
Planning, start and completion evidence
- Exact planning records
- 1
- Official record actions
- 1
- Explicit planning relationships
- 0
- Duplicate source rows consolidated
- 1
- Exact completion events
- 0
- Open exact official planning record: 2460292 Wicklow County Council
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Donard, Wicklow
- County
- Wicklow
Notice location variants
- the location of the new proposed site entrance CN0136794WW
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Wicklow County Council planning record Application details, status and decision record for 2460292. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
proposed residential development of 14no. pitched roof houses (Type A - 8no 4bed Semi Detached 2storey with converted attic and dormer to front, Type B - 4no 3bed Semi Detached 2storey and Type C - 2no 3 bed Detached 2storey) and all associated site development works to include services infrastructure, landscaping and boundary treatments with a new opening to the existing boundary wall to form site entrance on Barrack Street to facilitate new estate road, vehicular and pedestrian access and footpath to include the relinquishment of the existing public car parking at the location of the new proposed site entrance
Floor area stated for this source: 1,827 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.