Site start

Housing site start — Mallow

Mallow, Cork

1 commencement notice · start date 21 Jul 2023 · planning reference given

Planning 22/6751 · Planning application

View full project timeline

Commencement notices
1
Latest start date
21 Jul 2023
Latest notice
Scale not stated
Planning reference
22/6751
Location
Mallow, Cork

Location

Where the site is

Area
Mallow, Cork
County
Cork
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

Permission for the construction of a single-floor extension to the rear of the existing dwelling to be used as a sitting room, for alterations to the layout and south side elevation of the existing dwelling associated with the construction of the extension and for the replacement of all windows and front door entrance of the existing dwelling with more energy efficient windows and door.

Work stated for this notice Scale not stated for this notice.
Planning reference 22/6751

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.