Site start
Housing site start — Killimer
Killimer, Clare
1 commencement notice · start date 09 Nov 2021 · planning reference given
Planning P20 / 318
- Commencement notices
- 1
- Latest start date
- 09 Nov 2021
- Latest notice
- 501 m²
- Planning reference
- P20/318
- Location
- Killimer, Clare
Location
Where the site is
- Area
- Killimer, Clare
- County
- Clare
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The development, which will be located within a fenced compound c. 0.4 ha, will consist of a up to 400 MVA (electrical rating) synchronous condenser which shares the existing 400 kV/17 kV transformer and 400 kV underground cable belonging to the existing coal fired unit 2. The following plant will be included within the compound: a) main building (c. 420sq.m., c. 15m high) to house equipment including the synchronous condenser, flywheel, lube oil skid, air compressor and pumps. b) supporting items of plant including; cooling equipment (c. 690 sq.m., c. 3m high); c. 7m high modular containers to house electrical and control equipment (total area of c. 384 sq.m.); auxiliary transformer (c. 48 sq.m., 7m high) and electrical plant including an external circuit breaker (c. 66 sq.m., c. 9m high); connections to existing site services networks including electrical, water and wastewater and an underground surface water attenuation tank connecting to existing surface water drains. c) all other ancillary and miscellaneous site works including site clearance; site access, internal roads and development of areas of hard standing including a maintenance laydown area. d) the development will be bounded by a c. 3 m high chainlink fence. Site access will be by means of a new c. 2.7 m high palisade gate accessed from a new internal road within the station site.
Floor area stated for this source: 501 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.