Commencement notice group
Housing commencement notices — Naas
Naas, Kildare
7 unique commencement events · latest notified commencement 05 Feb 2021 · planning reference supplied
- Unique commencement events
- 7
- Latest notified commencement
- 05 Feb 2021
- Latest notice
- 26 units
- Planning references supplied
- 16/635
- Public location
- Naas, Kildare
Commencement and completion records
Planning, start and completion evidence
The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.
- Exact planning records
- Official record actions
- 0
- Explicit planning relationships
- Duplicate source rows consolidated
- Exact completion events
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Naas, Kildare
- County
- Kildare
Notice location variants
- Kildare CN0072345KE
- Notice source points are up to 394 m apart, so no combined representative point is shown.
Source positions remain separate:
- CN0072345KE · 53.196709, -6.667492 Open point
- CN0066618KE · 53.195820, -6.668368 Open point
- CN0056006KE · 53.196450, -6.667269 Open point
- CN0049326KE · 53.199040, -6.665890 Open point
- CN0045886KE · 53.196833, -6.665507 Open point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Bellingsfield, Pipershill, Naas, Co. Kildare-Part Phase 6 (6B). 26 no. units consisting of 24 no. semi detached units (18no.HTFF & 6no.HTEE) and 2no.detached units HTGG. Works to include all associated site works.
Floor area stated for this source: 3,638 m².
Bellingsfield, Pipershill, Naas, Co. Kildare-Part Phase 6 (6A). 25 no. units consisting of 18 no. semi detached units (10no.HTFF, 4no.HTEE,2no.HTLL,2no.HTKK) and 7no.detached units(6no. HTGG & 1no. HTG2). Works to include all associated site works.
Floor area stated for this source: 3,504 m².
Bellingsfield, Pipershill, Naas, Co. Kildare - Part Phase 5 - consisting of 26 no. semi detached units (16no. HTFF, 6no. HTEE, 2no. HTKK & 2no. HTLL) and 4 no. detached units consisting of 2no. HTGGs & 2no. HTG1s. Works including all associated site works.
Floor area stated for this source: 4,196 m².
Bellingsfield, Piperhill, Naas, Co. Kildare Phase 4 (Zone 4) to include 12 no. detached units consisting of house types GG & G4 and all associated site works.
Floor area stated for this source: 2,038 m².
Bellingsfield, Naas Co Kildare, Phase 3 (Zone 3) to include 40. no units consisting of the following house types; EE , FF, GG,& KK.
Floor area stated for this source: 5,144 m².
Bellingsfield, Naas Co Kildare, Phase 2 (Zone 2) to include 41. no units consisting of the following house types; EE , FF, GG, G2, G3, KK & LL.
PHASE 1 TO INCLUDE 41 NO. UNITS CONSISTING OF THE FOLLOWING HOUSE TYPES; HTEE, HTFF, HTGG, HTG2, HTKK & HTLL
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.