Housing site start — Monasterboice
Monasterboice, Louth
1 commencement notice · start date 13 Nov 2026 · planning reference given
Planning 2660402 · Planning application · Council file · external
- Commencement notices
- 1
- Latest start date
- 13 Nov 2026
- Latest notice
- 1 house
- Planning reference
- 2660402
- Location
- Monasterboice, Louth
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 0
- Repeat copies merged
- 1
- Completion certificates
- 0
- Open exact official planning record: 2660402 Louth County Council
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Location
Where the site is
- Area
- Monasterboice, Louth
- County
- Louth
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Louth County Council planning record Application details, status and decision record for 2660402. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
minor alterations to the existing dwelling comprising, Change of use of the attached domestic garage to use as a bedroom including the removal of the existing garage door, infilling garage door opening with new wall and window, installation of door to rear wall. 2. Change of use of the existing first floor area to use as 2no. bedrooms including the construction of internal walls and 2no. flat roof dormer extensions to rear pitch of the roof of the dwelling, 3. The decommissioning of the existing onsite septic tank and the installation of a new packaged wastewater treatment system, raised percolation area and all associated below ground services.
Floor area stated for this source: 303 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.