Site start

Housing site start — Monasterboice

Monasterboice, Louth

1 commencement notice · start date 13 Nov 2026 · planning reference given

Planning 2660402 · Planning application · Council file · external

Commencement notices
1
Latest start date
13 Nov 2026
Latest notice
1 house
Planning reference
2660402
Location
Monasterboice, Louth

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
1
Completion certificates
0

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Location

Where the site is

Area
Monasterboice, Louth
County
Louth
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Louth County Council planning record Application details, status and decision record for 2660402. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

minor alterations to the existing dwelling comprising, Change of use of the attached domestic garage to use as a bedroom including the removal of the existing garage door, infilling garage door opening with new wall and window, installation of door to rear wall. 2. Change of use of the existing first floor area to use as 2no. bedrooms including the construction of internal walls and 2no. flat roof dormer extensions to rear pitch of the roof of the dwelling, 3. The decommissioning of the existing onsite septic tank and the installation of a new packaged wastewater treatment system, raised percolation area and all associated below ground services.

Work stated for this notice 1 house Explicit phase quantity stated by the source.

Floor area stated for this source: 303 m².

Planning reference 2660402

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.