Commencement notice group
Housing commencement notices — Courtmacsherry
Courtmacsherry, Cork
1 separate notice · latest notified commencement 11 Sep 2023 · planning reference supplied
- Source notices
- 1
- Latest notified commencement
- 11 Sep 2023
- Latest notice
- 1 home
- Planning references supplied
- 22/06750
- Public location
- Courtmacsherry, Cork
Public source geography
Site location
- Public site / locality
- Courtmacsherry, Cork
- County
- Cork
Public site labels seen across the notices
- the existing dwelling
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Alterations and extension to the existing dwelling to include the construction of a new single storey extension to the rear of the existing, the upgrading of an existing farm entrance to form a new site entrance and access driveway, the removal of an existing septic tank and percolation area and replace with a new waste water treatment system and infiltration/ treatment area and all associated ancillary site works located at the existing dwelling.
1 home · 1,770 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.