Site start

Block I, AIB Bankcentre, Merrion Road/Serpentine Avenue, Dublin 4

Dublin 4, Dublin

1 commencement notice · start date 04 Nov 2019 · no planning reference given

Commencement notices
1
Latest start date
04 Nov 2019
Latest notice
2,818 m²
Planning references
None given
Location
Block I, L & K, AIB Bankcentre, Merrion Road/Serpentine Avenue, Dublin 4

Location

Where the site is

Area
Dublin 4, Dublin
County
Dublin

Addresses on the notices

  • Block I, L & K, AIB Bankcentre, Merrion Road/Serpentine Avenue, Dublin 4
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

No planning reference is supplied for this notice group.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.

Notice 1 Seven-day notice

Proposed material alteration to a previously approved office building FSC 1173/05 at Block I,L & K, AIB Bankcentre, Merrion Road / Serpentine Avenue, Dublin 4.(NB Other works which are outside the scope of this Fire Safety Certificate are been carried out under a seperate Commencement Notice without Documentation.)

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 2,818 m².

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.