Site start
Housing site start — Lucan
Lucan, Dublin
1 commencement notice · start date 20 Jul 2020 · planning reference given
Planning SD19B/0396 · Planning application · Council file · external
- Commencement notices
- 1
- Latest start date
- 20 Jul 2020
- Latest notice
- 28 m²
- Planning reference
- SD19B/0396
- Location
- Lucan, Dublin
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 0
- Repeat copies merged
- 1
- Completion certificates
- 0
- Open exact official planning record: SD19B/0396 South Dublin County Council
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Location
Where the site is
- Area
- Lucan, Dublin
- County
- Dublin
Addresses on the notices
- first floor level, side and rear elevations to accommodate light to existing landing
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file South Dublin County Council planning record Application details, status and decision record for SD19B/0396. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Part demolish attached garage to side of house to include, front and rear walls and roof; construct a new single storey, wrap around extension to the front, side and rear elevations; front extension to incorporate front entrance porch; alter first floor window to existing house, located to front left side and include two new windows to the existing house at first floor level, side and rear elevations to accommodate light to existing landing; new ensuite to existing house
Floor area stated for this source: 28 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.