Commencement notice group

Commencement notices — Trim

Trim, Meath

1 separate notice · latest notified commencement 06 Aug 2024 · planning reference supplied

Source notices
1
Latest notified commencement
06 Aug 2024
Latest notice
2,179 m²
Planning references supplied
24/156
Public location
Trim, Meath

Public source geography

Site location

Public site / locality
Trim, Meath
County
Meath
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

The exact official planning file is available below.

  • Official planning file Application details, decision and available documents Meath County Council · reference 24/156 Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external
Planning reference24/156

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0117946MH BCMS owner-supplied export

change of use of existing pharmaceutical building known as Franklin Pharmaceuticals Ltd. to engineering, fabrication and assembly building which will include modifications & revisions to plan layout and elevations. The development also includes removal of existing signage and erect new signage on the south and west elevations of the building together with all associated site works.

2,179 m² · stated on this notice

Planning reference 24/156 Builder stated: Bridlington Ltd T/a Colm O’Reilly Building Contractor Developer stated: Alfco Ventures LTD

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.