Commencement notice group
Housing commencement notices — Roundwood
Roundwood, Wicklow
3 unique commencement events · latest notified commencement 14 Nov 2018 · planning reference supplied
- Unique commencement events
- 3
- Latest notified commencement
- 14 Nov 2018
- Latest notice
- 244 m²
- Planning references supplied
- 16/1090
- Public location
- Roundwood, Wicklow
Public source geography
Site location
- Public site / locality
- Roundwood, Wicklow
- County
- Wicklow
Public site labels seen across the notices
- Callowhill Upper, Co
- Vartry Reservoir upgrade works
Notice coordinates differ materially, so no combined point is shown. Use the per-notice location actions in the timeline.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
A single storey energy recovery building at Callowhill Upper, Co. Wicklow, downstream of Vartry Reservoir. The building is to house a water turbine, electric generator and electrical transformer equipment as part of the Vartry to Callowhill link project on behalf of the end user Irish Water.
Floor area stated for this source: 244 m².
High Lift Pump Station at Vartry Reservoir upgrade works.
Floor area stated for this source: 279 m².
Vartry Reseviour upgrade works including Electrical distribution Building
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.