Commencement notice group

Commencement notices — Bray

Bray, Wicklow

1 separate notice · latest notified commencement 08 Jan 2024 · planning reference supplied

Source notices
1
Latest notified commencement
08 Jan 2024
Latest notice
1 unit
Planning references supplied
23659
Public location
Bray, Wicklow

Public source geography

Site location

Public site / locality
Bray, Wicklow
County
Wicklow
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

The exact official planning file is available below.

  • Official planning file Application details, decision and available documents Wicklow County Council · reference 23659 Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external
Planning reference23659

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0108407WW BCMS owner-supplied export

Refurbishment and upgrade of building fabric to include replacement of external joinery, new opening between rooms at first floor level, relocation of kitchen to first floor level, removal of partition to front rooms top level, relocation of kitchen to middle floor, installation of bathrooms in revised locations, new partitions to ground floor return, repair and reinstatement of plasterwork, new mechanical and electrical services, painting and decorating and ancillary associated alterations.

1 unit · 236 m² · stated on this notice

Planning reference 23659 Builder stated: P and P Construction

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.