Site start

Housing site start — Ballina

Ballina, Mayo

2 commencement notices · latest start date 14 Oct 2019 · planning reference given

Planning p18/8

Commencement notices
2
Latest start date
14 Oct 2019
Latest notice
Scale not stated
Planning reference
P18/8
Location
Ballina, Mayo

Location

Where the site is

Area
Ballina, Mayo
County
Mayo

Addresses on the notices

  • Carrentrilla Ballina
  • Claremorris, Mayo
Location evidence needs care
  • Notice source points are up to 43.8 km apart, so no combined representative point is shown.

Source positions remain separate:

  • Public notice source · 54.081528, -9.156427 Open point
  • Public notice source · 53.690629, -9.075685 Open point

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

Extension to the south elevation dwelling house ,alterations to front and rear at Carrentrilla Ballina

Work stated for this notice Scale not stated for this notice.
Planning reference P18/8
Notice 2 Commencement notice (owner-supplied)

Dwellinghouse and Effluent Treatment System

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 300 m².

Source unit value with scope not stated: 1 unit. It is not presented as notice-specific scale.

Planning reference P18/8

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.