Site start

Construction of 193 no. residential dwellings

Dublin 17, Dublin

2 commencement notices · latest start date 04 Sep 2026 · planning reference given

Planning LRD0046/S3 · Planning application

View full project timeline

Commencement notices
2
Latest start date
04 Sep 2026
Latest notice
295 m²
Planning reference
LRD0046/S3
Location
Dublin 17, Dublin

Commencement and completion records

Planning, start and completion

The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.

Planning applications
Links to official records
0
Links between applications
Repeat copies merged
Completion certificates

Location

Where the site is

Area
Dublin 17, Dublin
County
Dublin

Addresses on the notices

  • Malahide, Dublin
  • lands at former Teagasc Centre, Malahide Road, Kinsealy, Dublin, Fingal
  • former Teagasc Centre, Malahide Road, Kinsealy, Co
Location evidence needs care
  • Notice source points are up to 642 m apart, so no combined representative point is shown.

Source positions remain separate:

  • Public notice source · 53.428119, -6.177693 Open point
  • Public notice source · 53.422786, -6.173961 Open point

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

Construction of a single storey creche building of masonry construction with bin and bike shelter and all ancillary works at lands at former Teagasc Centre, Malahide Road, Kinsealy, Dublin, Fingal.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 295 m².

Planning reference LRD0046/S3 Developer stated: Grandbrind Limited
Notice 2 Commencement notice

Construction of 193 no. residential dwellings comprising 153 no. two storey houses (30 no. two-bed; and 123 no. three-bed houses) and 40 no. duplex units (20 no. two-bed ground floor apartments with 20 no. three-bed duplexes above) and arranged in three storey blocks, and all associated works at former Teagasc Centre, Malahide Road, Kinsealy, Co. Dublin.

Work stated for this notice 193 units Explicit phase quantity stated by the source.

Floor area stated for this source: 15,427 m².

Planning reference LRD0046/S3 Developer stated: Grandbrind Limited

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.