Commencement notice group
Building extension commencement notices — Navan
Navan, Meath
1 unique commencement event · latest notified commencement 17 May 2023 · planning reference supplied
- Unique commencement events
- 1
- Latest notified commencement
- 17 May 2023
- Latest notice
- 315 m²
- Planning references supplied
- 22/1064
- Public location
- Navan, Meath
Verified record connections
Planning, start and completion evidence
- Exact planning records
- 1
- Official record actions
- 1
- Explicit planning relationships
- 0
- Duplicate source rows consolidated
- 1
- Exact completion events
- 1
- Open exact official planning record: 22/1064 Meath County Council
- Completion certificate recorded — source scope not stated Meath County Council · commencement SN0008480MH Certificate CC00000050127MH · First observed in the official monthly source 2023-05 1 units stated for this certificate · One certificate representation
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Navan, Meath
- County
- Meath
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
The exact official planning file is available below.
-
Official planning file Meath County Council planning record Application details, status and decision record for 22/1064. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
change of use, extension, adaptation and refurbishment of the existing structure ot facilitate proposed use as an orthodontist surgery/clinic, spread across ground and first floor. Existing wall and roof finishes to be upgraded as per submitted drawings. This will also include for modified fenestration arrangements to both floors. The works wil also consist of a ground floor extension ot the front and side of hte existing unit, together with al required internal alterations and associated site works, inclusive of alterations to the existing front site boundary and vehicular access encompassing the replacement of existing security gates and fencing with new gates and low block work wall with integrated planting along front boundary line.
Floor area stated for this source: 315 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.