Commencement notice group
Housing commencement notices — Mulhuddart
Mulhuddart, Dublin, Dublin
7 unique commencement events · latest notified commencement 13 May 2024 · planning references supplied
- Unique commencement events
- 7
- Latest notified commencement
- 13 May 2024
- Latest notice
- 85 houses
- Planning references supplied
- F/104 · PARTXI/012
- Public location
- Mulhuddart, Dublin, Dublin
Commencement and completion records
Planning, start and completion evidence
The certificate is linked to its commencement notice. A corresponding planning record has not yet been established from the available source evidence.
- Exact planning records
- Official record actions
- 0
- Explicit planning relationships
- Duplicate source rows consolidated
- Exact completion events
Planning-anchored public geography
Site identity and location
- Canonical public locality
- Mulhuddart, Dublin, Dublin
- County
- Dublin
Notice location variants
- Church Fields, Damastown Avenue, Mulhuddart, Dublin 15 CN0004118FL, CN0114589FL, CN0112471FL, CN0112202FL, CN0110449FL, CN0110092FL, CN0109371FL
- Dublin, Dublin CN0110449FL, CN0109371FL
- Notice source points are up to 72.8 km apart, so no combined representative point is shown.
Source positions remain separate:
- CN0004118FL · 53.412734, -6.392733 Open point
- CN0114589FL · 53.413034, -6.396069 Open point
- CN0112471FL · 53.412785, -6.395322 Open point
- CN0112202FL · 53.779755, -7.305531 Open point
- CN0110449FL · 53.411698, -6.395576 Open point
- CN0110092FL · 53.412380, -6.393430 Open point
- CN0109371FL · 53.412606, -6.393735 Open point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Church Fields 7 - construction of 85 dwelling houses at Church Fields, Damastown Avenue, Mulhuddart, Dublin 15
Floor area stated for this source: 707,795 m².
Construction of Block A, a 4 storey apartment block (32 units) at Church Fields, Damastown Avenue, Mulhuddart, Dublin 15
Floor area stated for this source: 2,740 m².
Source unit value with scope not stated: 32 units. It is not presented as notice-specific scale.
Church Fields 5 - construction of 55 dwelling houses at Church Fields, Damastown Avenue, Mulhuddart, Dublin 15
Floor area stated for this source: 55,000 m².
Construction of Block B, a 4 storey apartment block (24 units) with ground floor Creche (shell & core) at Church Fields, Damastown Avenue, Mulhuddart, Dublin 15
Floor area stated for this source: 2,832 m².
Source unit value with scope not stated: 24 units. It is not presented as notice-specific scale.
Construction of Block C, a 4 storey apartment block (24 units) with ground floor commercial/ communal spaces (shell & core) at Church Fields, Damastown Avenue, Mulhuddart, Dublin 15
Floor area stated for this source: 2,737 m².
Source unit value with scope not stated: 24 units. It is not presented as notice-specific scale.
Church Fields 2 - construction of an ESB Substation building with Refuse & Bike Store at Church Fields, Damastown Avenue, Mulhuddart, Dublin 15
Floor area stated for this source: 56 m².
Church Fields 1 - construction of 80 dwelling houses (social & affordable) at Church Fields, Damastown Avenue, Mulhuddart, Dublin 15
Floor area stated for this source: 658,800 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.