Site start
Housing site start — Mulhuddart
Mulhuddart, Dublin
7 commencement notices · latest start date 13 May 2024 · planning references given
Planning PARTXI/012/21 (F/104/22)
- Commencement notices
- 7
- Latest start date
- 13 May 2024
- Latest notice
- 85 houses
- Planning references
- F/104 · PARTXI/012
- Location
- Mulhuddart, Dublin
Location
Where the site is
- Area
- Mulhuddart, Dublin
- County
- Dublin
Addresses on the notices
- Church Fields, Damastown Avenue, Mulhuddart, Dublin 15
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Church Fields 7 - construction of 85 dwelling houses at Church Fields, Damastown Avenue, Mulhuddart, Dublin 15
Construction of Block A, a 4 storey apartment block (32 units) at Church Fields, Damastown Avenue, Mulhuddart, Dublin 15
Floor area stated for this source: 2,740 m².
Source unit value with scope not stated: 32 units. It is not presented as notice-specific scale.
Church Fields 5 - construction of 55 dwelling houses at Church Fields, Damastown Avenue, Mulhuddart, Dublin 15
Floor area stated for this source: 55,000 m².
Construction of Block B, a 4 storey apartment block (24 units) with ground floor Creche (shell & core) at Church Fields, Damastown Avenue, Mulhuddart, Dublin 15
Floor area stated for this source: 2,832 m².
Source unit value with scope not stated: 24 units. It is not presented as notice-specific scale.
Construction of Block C, a 4 storey apartment block (24 units) with ground floor commercial/ communal spaces (shell & core) at Church Fields, Damastown Avenue, Mulhuddart, Dublin 15
Floor area stated for this source: 2,737 m².
Source unit value with scope not stated: 24 units. It is not presented as notice-specific scale.
Church Fields 2 - construction of an ESB Substation building with Refuse & Bike Store at Church Fields, Damastown Avenue, Mulhuddart, Dublin 15
Floor area stated for this source: 56 m².
Church Fields 1 - construction of 80 dwelling houses (social & affordable) at Church Fields, Damastown Avenue, Mulhuddart, Dublin 15
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.