Site start
Housing site start — Ballsbridge
Ballsbridge, Dublin
1 commencement notice · start date 11 Jul 2016 · planning reference given
Planning 2503/16
- Commencement notices
- 1
- Latest start date
- 11 Jul 2016
- Latest notice
- Scale not stated
- Planning reference
- 2503/16
- Location
- Ballsbridge, Dublin
Location
Where the site is
- Area
- Ballsbridge, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The development will consist of the partial demolition of the garage to the side. Demolition of the single storey extension and sheds to the side, conservatory and lean-to-roof to the rear, chimney stacks to side and rear of the existing two storey semi-detached dwelling. Construction of a new single storey flat roof extension with roof lights to the side & rear. Conversion of the existing attic space with the addition of dormer windows to the rear and roof lights to the side. New entrance door and lobby to the front. Widening of existing vehicular entrance off Merrion Road with new entrance gate and pillars. Associated site works.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.