Commencement notice group
Commencement notices — Portrane
Portrane, Dublin
2 unique commencement events · latest notified commencement 27 Nov 2015 · planning basis not stated
- Unique commencement events
- 2
- Latest notified commencement
- 27 Nov 2015
- Latest notice
- 25,324 m²
- Planning references supplied
- None stated
- Public location
- Portrane, Dublin
Public source geography
Site location
- Public site / locality
- Portrane, Dublin
- County
- Dublin
No usable public source coordinate is available for this notice group.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
The overall development comprises the construction of the 170-bed National Forensics Mental Health Service Hospital, totalling approx. 25,324sq.m. of floor area. This Commencement Notice relates to Phase 1 works only, which comprise the removal of asbestos from existing structures, demolition of selected existing site structures, diversion and removal of existing underground services, tree removal, archaeological excavation, construction of a new pedestrian path and a construction access road as well as the erection of hoardings to the site; all works are in preparation for the main contract works to the new facility (Phase 2), which will be subject to a separate Commencement Notice.
Floor area stated for this source: 25,324 m².
The overall development comprises the construction of the 170-bed National Forensics Mental Health Service Hospital, totalling approx. 25,324sq.m. of floor area. This Commencement Notice relates to Phase 1 works only, which comprise the removal of asbestos from existing structures, demolition of selected existing site structures, diversion and removal of existing underground services, tree removal, archaeological excavation, construction of a new pedestrian path and a construction access road as well as the erection of hoardings to the site; all works are in preparation for the main contract works to the new facility (Phase 2), which will be subject to a separate Commencement Notice.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.