Site start
Housing site start — Tramore
Tramore, Waterford
2 commencement notices · latest start date 05 May 2021 · planning reference given
Planning 2080 · Planning application · Council file · external
- Commencement notices
- 2
- Latest start date
- 05 May 2021
- Latest notice
- 626 m²
- Planning reference
- 2080
- Location
- Tramore, Waterford
Linked records
Planning, start and completion
- Planning applications
- 1
- Links to official records
- 1
- Links between applications
- 0
- Repeat copies merged
- 2
- Completion certificates
- 2
- Open exact official planning record: 2080 Waterford City and County Council · checked 2026-07-29T15:36:26+00:00
Planning 2080 — CONDITIONAL · Decision 2020-06-04
Exact appeal 307418 · Grant permission with revised conditions · 2020-11-06 · Open official case
- Completion certificate recorded — source scope not stated Waterford City and County Council · commencement notice Completion certificate · First observed in the official monthly source 2021-03 21 units stated for this certificate · One certificate representation
- Completion certificate recorded — source scope not stated Waterford City and County Council · commencement notice Completion certificate · First observed in the official monthly source 2021-05 6 units stated for this certificate · One certificate representation
Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.
Location
Where the site is
- Area
- Tramore, Waterford
- County
- Waterford
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Official drawings and scanned-file sources are available below.
Public application drawings are available for this notice group.
Use the official drawings or scanned files to review the submitted plans and elevations.
-
Official scanned files Official scanned planning files Submitted drawings and application documents for planning reference 2080. Waterford City and County Council Official link · last checked 31 Jul 2026 Stable direct document supplied by the exact official planning case.Open official scanned files · external
-
Architecture Drawings Plans, Sections, Elevations Exact official drawing for 2080. Waterford City and County Council Official link · last checked 31 Jul 2026 Stable direct document supplied by the exact official planning case.Open official architecture drawing · external
-
Official planning file Waterford City and County Council planning record Application details, status and decision record for 2080. Waterford City and County Council Official link · last checked 29 Jul 2026 Exact official source shared from the planning and approval record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The construction of 6 residential units (No's 11-16 incl) and all associated site works.
Floor area stated for this source: 626 m².
Source unit value with scope not stated: 6 units. It is not presented as notice-specific scale.
The construction of 21 residential units and all associated site works.
Floor area stated for this source: 2,010 m².
Source unit value with scope not stated: 21 units. It is not presented as notice-specific scale.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.