Commencement notice group

Housing commencement notices — Tramore

Tramore, Waterford

2 unique commencement events · latest notified commencement 05 May 2021 · planning reference supplied

View full project timeline

Unique commencement events
2
Latest notified commencement
05 May 2021
Latest notice
626 m²
Planning references supplied
2080
Public location
Tramore, Waterford

Verified record connections

Planning, start and completion evidence

Exact planning records
1
Official record actions
1
Explicit planning relationships
0
Duplicate source rows consolidated
2
Exact completion events
2

Planning 2080 — CONDITIONAL · Decision 2020-06-04

  1. Completion certificate recorded — source scope not stated Waterford City and County Council · commencement notice Completion certificate · First observed in the official monthly source 2021-03 21 units stated for this certificate · One certificate representation
  2. Completion certificate recorded — source scope not stated Waterford City and County Council · commencement notice Completion certificate · First observed in the official monthly source 2021-05 6 units stated for this certificate · One certificate representation

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Planning-anchored public geography

Site identity and location

Canonical public locality
Tramore, Waterford
County
Waterford
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Official drawings and scanned-file sources are available below.

Public application drawings are available for this notice group.

Use the official drawings or scanned files to review the submitted plans and elevations.

  • Official scanned files Official scanned planning files Submitted drawings and application documents for planning reference 2080. Waterford City and County Council Official link · last checked 31 Jul 2026 Stable direct document supplied by the exact official planning case.
    Open official scanned files · external
  • Architecture Drawings Plans, Sections, Elevations Exact official drawing for 2080. Waterford City and County Council Official link · last checked 31 Jul 2026 Stable direct document supplied by the exact official planning case.
    Open official architecture drawing · external
  • Official planning file Waterford City and County Council planning record Application details, status and decision record for 2080. Waterford City and County Council Official link · last checked 29 Jul 2026 Exact official source shared from the planning and approval record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

The construction of 6 residential units (No's 11-16 incl) and all associated site works.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 626 m².

Source unit value with scope not stated: 6 units. It is not presented as notice-specific scale.

Builder stated: DFL Construction Ltd Developer stated: DFL Construction Ltd
Notice 2 Commencement notice (owner-supplied)

The construction of 21 residential units and all associated site works.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 2,010 m².

Source unit value with scope not stated: 21 units. It is not presented as notice-specific scale.

Builder stated: DFL Construction Ltd Developer stated: DFL Construction Ltd

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.