Site start

Housing site start — Ringsend

Ringsend, Dublin

3 commencement notices · latest start date 07 Oct 2024 · planning reference given

Planning PWSDZ3700/24 · Planning application

View full project timeline

Commencement notices
3
Latest start date
07 Oct 2024
Latest notice
270 units
Planning reference
PWSDZ3700/24
Location
Ringsend, Dublin

Location

Where the site is

Area
Ringsend, Dublin
County
Dublin

Addresses on the notices

  • Ground Level
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Seven-day notice

Block E1, E2 and E2A Residential Blocks at Phase 2, Glass Bottle, Sean Moore Road, Dublin 4 Block E1, E2 & E2A Residential Blocks comprise of the following • Block E1 - Ground Floor + 7 upper floors • Block E2 - Ground Floor + 7 upper floors • Block E2A - Ground Floor + 7 upper floors In tandem to this application, 2No. additional commencement notices have been lodged as follows • Block D1 & D2 Residential Blocks • Phase 2 Basement (which is underneath and connected to Blocks D and E)

Work stated for this notice 270 units Explicit phase quantity stated by the source.

Floor area stated for this source: 53,670 m².

Planning reference PWSDZ3700/24
Notice 2 Seven-day notice

Block D1 and D2 Residential Blocks at Phase 2, Glass Bottle, Sean Moore Road, Dublin 4 Block D1 and D2 Residential Blocks comprise of the following • Block D1 - Ground Floor + 7 upper floors • Block D2 - Ground Floor + 7 upper floors In tandem to this application, 2No. additional commencement notices have been lodged as follows • Block E1, E2 and E2A Residential Blocks • Phase 2 Basement (which is underneath and connected to Blocks D and E)

Work stated for this notice 232 units Explicit phase quantity stated by the source.

Floor area stated for this source: 43,630 m².

Planning reference PWSDZ3700/24
Notice 3 Seven-day notice

Glass Bottle Phase 2 – Basement - 1No. Level of basement and associated basement escape stair and lift pop ups at Ground Level. The new residential development, Phase 2 Glass Bottle, will consist of five residential blocks situated over a common basement at Glass Bottle Site, Sean Moore Road, Dublin 4 This commencement notice comprises of the following • 1No. Level of basement and associated basement escape stair and lift pop ups at Ground Level. This commencement notice is concerned solely with the initial phase of the development which comprises the Basement Level. As part of this commencement notice, there is no accommodation proposed at Ground Floor Level or above Ground level with the exception of the stair and lift pop ups at Ground Level. In tandem to this commencement notice, 2 No. additional commencement notices have been lodged as follows: • Block D1 and D2 Residential • Block E1, E2 and E2A Residential Blocks

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 10,655 m².

Planning reference PWSDZ3700/24

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.