Site start

Housing site start — Inchicore

Inchicore, Dublin

1 commencement notice · start date 30 Oct 2025 · planning references given

Planning 4821/22 (ABP-316207-23)

Commencement notices
1
Latest start date
30 Oct 2025
Latest notice
2,750 m²
Planning references
4821/22 · ABP-316207-23
Location
Inchicore, Dublin

Reviewed planning, commencement and document evidence

View the dossier catalogue

Exact reviewed project dossier for ABP-316207-23, ABP-316207-23 under Dublin City Council, retaining 1 separate commencement identities.

Commencement identities
1
retained separately
Latest group date
2025-10-30
not assigned across events
Maximum on one notice
Not stated
never summed
Reviewed index
1
1 exact document links

Planning and appeal references

Every retained commencement event

  • 2025-10-30 Commencement notice Official public source URL unavailable in the reviewed projection

Exact organisation roles

  • Dublin City CouncilPlanningauthority · Authority retained with the exact reviewed planning identity.
  • An Coimisiún PleanálaAppealauthority · Exact appeal identity retained in the reviewed evidence.

Explicit facts with official citations

Each statement keeps its exact reference, official title or drawing-title locator, and review state.

  • Appealcase Exact official case identity ABP-316207-23 is indexed for this dossier. ABP-316207-23 · Appeal decision and documents · Appeal decision and documents · reviewedexactdestination Open official evidence
  • Decisionorder The exact official file index lists "Appeal decision and documents". ABP-316207-23 · Appeal decision and documents · Appeal decision and documents · reviewedexactdestination Open official evidence

Official document index highlights

Exact official destinations and retained explicit document titles; this is not asserted to be the complete authority file.

Location

Where the site is

Area
Inchicore, Dublin
County
Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Official source links are available below.

  • Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for ABP-316207-23. An Coimisiún Pleanála Official link · not recently checked Exact official source shared from the planning and approval record.
    Open official appeal/SHD case · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

Construction of 2# Apartment Blocks (1# 3-storey block + 1# 4-storey block containing 40# 1-bedroom apartments with private balconies, accessed off covered external walkways. Community Centre on Ground Floor Block A. Enclosed Refuse Store. ESB substation + services compound. Demolition of existing residential block units.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 2,750 m².

Source unit value with scope not stated: 40 units. It is not presented as notice-specific scale.

Planning reference 4821/22 Appeal reference ABP-316207-23

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.