Building extension site start — Dublin
Dublin 6, Dublin
1 commencement notice · start date 23 Jun 2023 · planning reference given
Planning 3947/22 · Planning application
- Commencement notices
- 1
- Latest start date
- 23 Jun 2023
- Latest notice
- 245 m²
- Planning reference
- 3947/22
- Location
- Dublin 6, Dublin
Location
Where the site is
- Area
- Dublin 6, Dublin
- County
- Dublin
Addresses on the notices
- first floor e) modifying internal and external walls indicated on plans all at No
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
a) construction of two-storey extension to the rear including roof light, b) construction of external access ramp to front including modifying existing railings and plinth, c) moving the existing front external stairs to basement from the right to the left side including modifying existing railings and plinth d) construction of new internal stair flight from first floor landing to existing rear extension at first floor e) modifying internal and external walls indicated on plans all at No. 48 Mount Pleasant Square, Dublin 6
Floor area stated for this source: 245 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.