Commencement notice group

Building extension commencement notices — Dún Laoghaire

Dún Laoghaire, Dublin

1 separate notice · latest notified commencement 28 May 2026 · planning reference supplied

Source notices
1
Latest notified commencement
28 May 2026
Latest notice
1 unit
Planning references supplied
D23B/0094
Public location
Dún Laoghaire, Dublin

Public source geography

Site location

Public site / locality
Dún Laoghaire, Dublin
County
Dublin

Public site labels seen across the notices

  • rear, single storey extension to front and attic conversion for storage
Approximate source location. Use the larger map if the inline map is unavailable.
Approximate source location — not an official site boundary Open larger map

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Project documents

Drawings & planning documents

A planning reference is supplied, but PlanningBrief has not published a healthy exact official planning-file link.

Planning referenceD23B/0094

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0142571DR BCMS owner-supplied export

Two storey extension at rear, single storey extension to front and attic conversion for storage.

1 unit · 42 m² · stated on this notice

Planning reference D23B/0094 Builder stated: Lewins Construction Developer stated: Lewins Construction

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.