Site start
Widening of the vehicular entrance to 3.5M. Construction of a 13.5sqm first-floor
Dublin 3, Dublin
1 commencement notice · start date 06 Oct 2026 · no planning reference given
Planning Planning application · Council file · external
- Commencement notices
- 1
- Latest start date
- 06 Oct 2026
- Latest notice
- 147 m²
- Planning references
- None given
- Location
- Dublin 3, Dublin
Location
Where the site is
- Area
- Dublin 3, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
Widening of the vehicular entrance to 3.5M. Construction of a 13.5sqm first-floor extension over the 13.5sqm garage (to be converted into accommodation). A part 2-storey extension to the rear (4sqm to upper floor, 27sqm to ground floor). The existing front door to be a hall window, the new front door relocated to front of converted garage.
Floor area stated for this source: 147 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.