Commencement notice group
Housing commencement notices — Ard Finn
Sligo, Sligo
8 unique commencement events · latest notified commencement 11 May 2022 · planning basis not stated
- Unique commencement events
- 8
- Latest notified commencement
- 11 May 2022
- Latest notice
- 86 houses
- Planning references supplied
- None stated
- Public location
- Sligo, Sligo
Public source geography
Site location
- Public site / locality
- Sligo, Sligo
- County
- Sligo
Public site labels seen across the notices
- Ard Finn, Sligo
Notice coordinates differ materially, so no combined point is shown. Use the per-notice location actions in the timeline.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
No planning reference is supplied for this notice group.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.
Phase 8 - Construction of 4 dwelling units (units 84-87) out of an overall total of 86 dwelling units, together with all associated site works including a pedestrian link to Knappagh Road / Strandhill Road
Floor area stated for this source: 500 m².
Phase 7 - Construction of apartment building J (units 75-76) out of an overall total of 86 dwelling units, together with all associated site works including a pedestrian link to Knappagh Road / Strandhill Road
Floor area stated for this source: 279 m².
Phase 6 - Construction of apartment building K1 and L1 (units 70-74) out of an overall total of 86 dwelling units, together with all associated site works including a pedestrian link to Knappagh Road / Strandhill Road
Floor area stated for this source: 422 m².
Phase 5 - Construction of 22 dwelling units (units 36-53 & 77-80) out of an overall total of 86 dwelling units, together with all associated site works including a pedestrian link to Knappagh Road / Strandhill Road
Floor area stated for this source: 3,337 m².
Phase 4 - Construction of apartment building K2 consisting of 3 no. dwelling units (units 81-83) out of an overall total of 86 dwelling units, together with all associated site works including a pedestrian link to Knappagh Road / Strandhill Road
Floor area stated for this source: 290 m².
Phase 3 - Construction of 16 dwelling units (units 54-69) out of an overall total of 81 dwelling units, together with all associated site works including a pedestrian link to Knappagh Road / Strandhill Road
Floor area stated for this source: 1,808 m².
Phase 2 - construction of 12 dwelling units out of an overall total of 81 dwelling units, together with all associated site works including a pedestrian link to Knappagh Road / Strandhill Road
Floor area stated for this source: 1,909 m².
Phase 1 - construction of 22 dwelling units out of an overall total of 81 dwelling units, together with all associated site works including a pedestrian link to Knappagh Road / Strandhill Road
Floor area stated for this source: 2,599 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.