Building extension commencement notices — Dublin

Dublin 6W, Dublin

1 unique commencement event · latest notified commencement 07 Sep 2026 · planning basis not stated

View full project timeline

Unique commencement events
1
Latest notified commencement
07 Sep 2026
Latest notice
244 m²
Planning references supplied
None stated
Public location
Dublin 6W, Dublin

Verified record connections

Planning, start and completion evidence

Exact planning records
1
Official record actions
1
Explicit planning relationships
0
Duplicate source rows consolidated
1
Exact completion events
0

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Planning-anchored public geography

Site identity and location

Canonical public locality
Dublin 6W, Dublin
County
Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file South Dublin County Council planning record Application details, status and decision record for SD25B/0564W. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.

CN0146897SD BCMS open-data feed

The proposed development will consist of; a) Demolition of existing chimney to rear, b) Demolition of existing single storey bay window to the front, c) Single storey flat roof extension to the rear, d) 2-storey extension to the front/side with new half hip roof to the side, e) 1no. rooflight to the front and 2no. rooflights to the rear of new roof, f) dormer extension to the rear of existing attic, g) Alterations to front elevation, h) Widening of existing vehicular entrance to 3.5 m and all associated site works.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 244 m².

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.