Site start

Housing site start — Limerick

Limerick

18 commencement notices · latest start date 29 May 2026 · planning reference given

Planning ABP-311588-21 · Planning application

Planning story

Greenpark strategic housing permission

Exact official references
ABP-311588-21
Final official decision
Granted with conditions
Commencement notices
18
Latest start date
29 May 2026

No overall constructed, completed-unit or percentage-progress figure is inferred from these notices.

Commencement notices
18
Latest start date
29 May 2026
Latest notice
12 units
Planning reference
ABP-311588-21
Location
Limerick

Linked records

Planning, start and completion

Planning applications
1
Links to official records
1
Links between applications
0
Repeat copies merged
0
Completion certificates
0

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Reviewed planning, commencement and document evidence

View the dossier catalogue
Commencement identities
19
retained separately
Latest group date
29 May 2026
not assigned across events
Maximum on one notice
86 units
never summed
Reviewed index
0
0 exact document links

Planning and appeal references

  • Appeal ABP-311588-21 Exact dated record link unavailable in this reviewed source

Every retained commencement event

  • Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
  • Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
  • Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
  • Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
  • Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
  • Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
  • Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
  • Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
  • Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
  • Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
  • Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
  • Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
  • Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
  • Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
  • Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
  • Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
  • Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
  • Date not stated Commencement notice Official public source URL unavailable in the reviewed projection
  • Date not stated Commencement notice Official public source URL unavailable in the reviewed projection

Exact organisation roles

  • Limerick City and County CouncilPlanningauthority · Authority recorded against the reviewed planning reference.
  • An Coimisiún PleanálaAppealauthority · One or more appeal references are retained.

Location

Where the site is

Area
Limerick
County
Limerick

Addresses on the notices

  • ground level
Location evidence needs care
  • Notice source points are up to 137.7 km apart, so no combined representative point is shown.

Source positions remain separate:

  • Public notice source · 53.581276, -7.293497 Open point
  • Public notice source · 52.647242, -8.649265 Open point
  • Public notice source · 52.647270, -8.649373 Open point
  • Public notice source · 52.649004, -8.650422 Open point
  • Public notice source · 52.648266, -8.649150 Open point
  • Public notice source · 52.649004, -8.650422 Open point
  • Public notice source · 52.649004, -8.650422 Open point
  • Public notice source · 52.649004, -8.650422 Open point
  • Public notice source · 52.649004, -8.650422 Open point
  • Public notice source · 52.649004, -8.650422 Open point
  • Public notice source · 52.649004, -8.650422 Open point
  • Public notice source · 52.649004, -8.650422 Open point
  • Public notice source · 52.649004, -8.650422 Open point
  • Public notice source · 52.647808, -8.643922 Open point
  • Public notice source · 52.649004, -8.650422 Open point
  • Public notice source · 52.649004, -8.650422 Open point
  • Public notice source · 52.649004, -8.650422 Open point
  • Public notice source · 52.649004, -8.650422 Open point

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Official drawings and scanned-file sources are available below.

Public application drawings are available for this notice group.

Use the official drawings or scanned files to review the submitted plans and elevations.

  • Architecture Drawings Proposed Site Plan sht1.pdf Listed on the exact official case page for ABP-311588-21. An Coimisiún Pleanála Official link · last checked 30 Jul 2026 Exact document URL indexed offline from the official case page; case number retained in the destination.
    Open official architecture drawing · external
  • Engineering Drawings Engineering Drawing Register.pdf Listed on the exact official case page for ABP-311588-21. An Coimisiún Pleanála Official link · last checked 30 Jul 2026 Exact document URL indexed offline from the official case page; case number retained in the destination.
    Open official engineering drawing · external
  • Official environmental report Environmental Impact Assessment - Volume 1 - Non Technical Summary.pdf Listed on the exact official case page for ABP-311588-21. An Coimisiún Pleanála Official link · last checked 30 Jul 2026 Exact document URL indexed offline from the official case page; case number retained in the destination.
    Open EIAR document · external
  • Landscape Drawings Access Road Landscape Masterplan.pdf Listed on the exact official case page for ABP-311588-21. An Coimisiún Pleanála Official link · last checked 30 Jul 2026 Exact document URL indexed offline from the official case page; case number retained in the destination.
    View official drawings · external
  • Official associated document SHD Planning Application Form + Appendices.pdf Listed on the exact official case page for ABP-311588-21. An Coimisiún Pleanála Official link · last checked 30 Jul 2026 Exact document URL indexed offline from the official case page; case number retained in the destination.
    Open associated document · external
  • Official SHD case Appeal decision and documents Inspector's report, order, direction and meeting record for ABP-311588-21. An Coimisiún Pleanála Official link · last checked 30 Jul 2026 Exact official source shared from the planning and approval record.
    Open official appeal/SHD case · external
  • Official decision document Inspector's report Listed on the exact official case page for ABP-311588-21. An Coimisiún Pleanála Official link · last checked 30 Jul 2026 Exact document URL indexed offline from the official case page; case number retained in the destination.
    Open inspector’s report · external
  • Official decision document Order Listed on the exact official case page for ABP-311588-21. An Coimisiún Pleanála Official link · last checked 30 Jul 2026 Exact document URL indexed offline from the official case page; case number retained in the destination.
    Open order · external
  • Official decision document Direction Listed on the exact official case page for ABP-311588-21. An Coimisiún Pleanála Official link · last checked 30 Jul 2026 Exact document URL indexed offline from the official case page; case number retained in the destination.
    Open direction · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Seven-day notice

Phase 5A development. BT9 block 74 will consist of a 3 storey duplex with 6 apartments on the ground floor and 6 duplexes above.

Work stated for this notice 12 units Explicit phase quantity stated by the source.

Floor area stated for this source: 1,001 m².

Appeal reference ABP-311588-21 Developer stated: Voyage Property Limited
Notice 2 Commencement notice (owner-supplied)

Phase 2A Block A consisting of a 5 storey apartment block with 47no apartments (15no 1bed, 32no 2 bed)and 2 no amenity areas

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 4,635 m².

Source unit value with scope not stated: 86 units. It is not presented as notice-specific scale.

Appeal reference ABP-311588-21 Developer stated: Voyage Property Ltd
Notice 3 Commencement notice (owner-supplied)

Phase 2B Block B consisting of a 4 storey apartment block with 39no apartments (12 no 1bed, 27no 2 bed)

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 3,701 m².

Source unit value with scope not stated: 86 units. It is not presented as notice-specific scale.

Appeal reference ABP-311588-21 Developer stated: Voyage Property Ltd
Notice 4 Seven-day notice

Phase 3A development. BT14 Block (25 0 34) will consist of a 3 storey duplex with 5 apartments on ground floor and 5 duplexes above.

Work stated for this notice 10 units Explicit phase quantity stated by the source.

Floor area stated for this source: 833 m².

Appeal reference ABP-311588-21
Notice 5 Seven-day notice

Construction of a creche building as part of a larger residential development.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 524 m².

Appeal reference ABP-311588-21
Notice 6 Commencement notice (owner-supplied)

Phase 1C.1 Development. BT4 Block 27 will consist of 3 storey duplex with 2 apartments on ground floor and 2 duplexes above.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 196 m².

Source unit value with scope not stated: 4 units. It is not presented as notice-specific scale.

Appeal reference ABP-311588-21 Developer stated: Voyage Property Ltd
Notice 7 Commencement notice (owner-supplied)

Phase 1D.1 Development. BT4 Block 40 will consist of 3 storey duplex with 2 apartments on ground floor and 2 duplexes above.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 196 m².

Source unit value with scope not stated: 4 units. It is not presented as notice-specific scale.

Appeal reference ABP-311588-21 Developer stated: Voyage Property Ltd
Notice 8 Commencement notice

Phase 1B.2 development consists of 26 no. 3 bed (16 semi-detached and 6 end of Terrace) and 4 no. 2 bed mid terrace houses.

Work stated for this notice 26 houses Explicit phase quantity stated by the source.

Floor area stated for this source: 2,670 m².

Appeal reference ABP-311588-21
Notice 9 Commencement notice (owner-supplied)

Phase 1B.1 Development. BT4 Block 12 will consist of 3storey duplex with 2 apartments on ground floor and 2 duplex units above.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 196 m².

Source unit value with scope not stated: 4 units. It is not presented as notice-specific scale.

Appeal reference ABP-311588-21 Developer stated: Voyage Property Ltd
Notice 10 Commencement notice

Phase 1D.2 development consists of 14no. 3bed (8 semi detached and 6 end of terrace) and 9no. 2 bed mid terrace houses.

Work stated for this notice 23 houses Explicit phase quantity stated by the source.

Floor area stated for this source: 2,280 m².

Appeal reference ABP-311588-21
Notice 11 Commencement notice

Phase 1C.2 development consists of 16no. 3bed (12 semi detached and 4 end of terrace) and 6no. 2 bed mid terrace houses.

Work stated for this notice 22 houses Explicit phase quantity stated by the source.

Floor area stated for this source: 2,220 m².

Appeal reference ABP-311588-21
Notice 12 Commencement notice

Phase 1A.7 Development consists of 5 terraced houses and 4 no. 3bed semi-detached houses. Terraced houses comprise 3 no. 2bed mid terrace and 2 no. 3bed houses end of terrace.

Work stated for this notice 9 houses Explicit phase quantity stated by the source.

Floor area stated for this source: 6,376 m².

Appeal reference ABP-311588-21
Notice 13 Commencement notice (owner-supplied)

Phase 1A.6 Development. BT4 Block 8 will consist of 3storey duplex with 2 apartments on ground floor and 2 duplex units above.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 196 m².

Source unit value with scope not stated: 4 units. It is not presented as notice-specific scale.

Appeal reference ABP-311588-21 Developer stated: Voyage Property Ltd
Notice 14 Commencement notice (owner-supplied)

Development consists of 5 terraced houses and 4 no. 3 bed semi- detached houses. Terraced houses comprise 3 no. 2 bed mid terrace and 2 no. 3 bed houses end of terrace.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 870 m².

Source unit value with scope not stated: 9 houses. It is not presented as notice-specific scale.

Appeal reference ABP-311588-21 Developer stated: Voyage Property Ltd
Notice 15 Commencement notice

Phase 1A.4 Development. BT4 Block 7 will consist of 2 apartments on ground floor and 2 duplex units above.

Work stated for this notice 4 units Explicit phase quantity stated by the source.

Floor area stated for this source: 402 m².

Appeal reference ABP-311588-21
Notice 16 Commencement notice (owner-supplied)

The application relates to 4 no. Terrace Houses. Each unit is provided with its own independent entrance located at ground level.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 1,992 m².

Source unit value with scope not stated: 4 houses. It is not presented as notice-specific scale.

Appeal reference ABP-311588-21 Developer stated: Voyage Property Ltd
Notice 17 Commencement notice (owner-supplied)

Phase 1A Development. BT4 Block 1 will consist of a 3 storey duplex with apartments on the ground floor and duplexes above.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 402 m².

Source unit value with scope not stated: 4 units. It is not presented as notice-specific scale.

Appeal reference ABP-311588-21 Developer stated: Voyage Property Ltd
Notice 18 Commencement notice (owner-supplied)

Phase 1A Development. BT4 Block 3 will consist of a 3 storey duplex with apartments on the ground floor and duplexes above.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 402 m².

Source unit value with scope not stated: 4 units. It is not presented as notice-specific scale.

Appeal reference ABP-311588-21 Developer stated: Voyage Property Ltd

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.