Commencement notice group

Housing commencement notices — Wellpark

Wellpark, Galway

2 unique commencement events · latest notified commencement 05 Dec 2023 · planning basis not stated

View full project timeline

Unique commencement events
2
Latest notified commencement
05 Dec 2023
Latest notice
1 unit
Planning references supplied
None stated
Public location
Wellpark, Galway

Verified record connections

Planning, start and completion evidence

Exact planning records
1
Official record actions
1
Explicit planning relationships
0
Duplicate source rows consolidated
1
Exact completion events
0

Planning 17382 — CONDITIONAL · Decision 2018-10-25 · Final grant 2019-05-27

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Major-project dossier · Wave 2 · W2-042 · Batch 3

Reviewed planning, commencement and document evidence

View the dossier catalogue

Exact project story for 17382 under Galway City Council, retaining 2 separate commencement identities.

Publication-ready dossier #27 Exact planning identity plus 5 official drawing/report/decision titles; commencement events remain separate.

Source-backed scopeHousing commencement notices — Wellpark

Planning permission scale, commencement-event scale and official document titles remain separate; no notice totals are summed.

Commencement identities
2
retained separately
Latest group date
2023-12-05
not assigned across events
Maximum on one notice
14 units
never summed
Reviewed index
5
5 exact document links
Permitted scale
12 units
permission record; not summed with notices

Planning and appeal references

Supplier screening cues

  • Residential or built-area scale screening cuePermitted scale record states 12 residential units and 1,500 m² floor area.
  • Civil, drainage and SuDS screening cueOfficial file index includes “Conditions 2 - Proposed Traffic Engineering Layout”.
  • Landscape, play and ecology screening cueOfficial file index includes “Conditions 4 - Proposed Landscape Layout”.

Every retained commencement event

  • 2023-10-19 Commencement notice 14 units on this event · 1408 m² on this event Official public source URL unavailable in the reviewed projection
  • 2023-12-05 Commencement notice 1 units on this event · 1408 m² on this event

Exact organisation roles

  • Galway City CouncilPlanningauthority · Exact official planning record 17382.
  • An Coimisiún PleanálaAppealauthority · One or more exact official appeal references are retained.

Explicit facts with official citations

Each statement keeps its exact reference, official title or drawing-title locator, and review state.

  • Planningoutcome Planning outcome recorded as CONDITIONAL. 17382 · Official planning record — 17382 · Decision field · exactauthorityreferencerecord Open official evidence
  • Permittedscale Permitted scale record states 12 residential units and 1,500 m² floor area. 17382 · Official planning record — 17382 · Residential units and floor-area fields · exactauthorityreferencerecord Open official evidence
  • Engineeringanddrainage Official file index includes “Conditions 2 - Proposed Traffic Engineering Layout”. 17382 · Conditions 2 - Proposed Traffic Engineering Layout · Conditions 2 - Proposed Traffic Engineering Layout · availablefreshsession Open official evidence
  • Landscapeplayecology Official file index includes “Conditions 4 - Proposed Landscape Layout”. 17382 · Conditions 4 - Proposed Landscape Layout · Conditions 4 - Proposed Landscape Layout · availablefreshsession Open official evidence
  • Otherreport Official file index includes “Condition 4 - Parks Report”. 17382 · Condition 4 - Parks Report · Condition 4 - Parks Report · availablefreshsession Open official evidence
  • Otherdrawing Official file index includes “Condition 9 - Construction Management Plan”. 17382 · Condition 9 - Construction Management Plan · Condition 9 - Construction Management Plan · availablefreshsession Open official evidence

Official document index highlights

Official drawing, report and decision titles retained from an exact authority/reference inventory; the index is not asserted to reproduce the complete authority file.

Source limitations and event boundary

Event identities aligned. The reviewed dossier snapshot and the current public group contain the same commencement references.

  • The reviewed official index did not expose a classified site layout, phasing, architecture, inspector/planner report, decision/order title.
  • 1 of 2 retained commencement identities has no publishable official source URL in the reviewed projection; its identity is retained without upgrading that source state.
  • Organisation roles are limited to the exact planning authority and, where present, the appeal authority; no project-team or supplier role is inferred.

Planning-anchored public geography

Site identity and location

Canonical public locality
Wellpark, Galway
County
Galway

Notice location variants

  • Galway, Galway
  • Moneenageisha Road, Galway
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Galway City Council planning record Application details, status and decision record for 17382. Official council planning portal Official link · last checked 29 Jul 2026 Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.

Notice 1 Commencement notice

Phase 2 building works for (a) two storey apartment block with two 2 bed apartments and three 3 bed apartments with an overall floor area of 381.76 Sqm, (b) four-storey apartment block with two one- bed apartments and eight two-bed apartments with an overall floor area of 772.1 sqm, access road, car parking facilities, bin storage, bicycle stands, landscaping, services and all associated site works at Moneenageisha Road, Galway

Work stated for this notice 1 unit Explicit phase quantity stated by the source.

Floor area stated for this source: 1,408 m².

Notice 2 Commencement notice (owner-supplied)

Phase 1 foundation & ground works for (a) two storey apartment block with two 2 bed apartments and three 3 bed apartments with an overall floor area of 381.76 Sqm, (b) four-storey apartment block with two one- bed apartments and eight two-bed apartments with an overall floor area of 772.1 sqm, access road, car parking facilities, bin storage, bicycle stands, landscaping, services and all associated site works at Moneenageisha Road, Galway

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 1,408 m².

Source unit value with scope not stated: 14 units. It is not presented as notice-specific scale.

Developer stated: Curley Holdings

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.