Housing site start — Scariff

Scariff, Clare

1 commencement notice · start date 08 Feb 2021 · planning reference given

Planning P19/336

Commencement notices
1
Latest start date
08 Feb 2021
Latest notice
450 m²
Planning reference
P19/336
Location
Scariff, Clare

Location

Where the site is

Area
Scariff, Clare
County
Clare
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

Construction of a single storey extension to provide 5 bedrooms with ensuite facilities, staff support rooms new sitting area and associated site works. The proposal will also include the demolition of an existing flat roofed extension and the relocation of existing services and storage tanks to a new boiler house and compound to the north of the site.

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 450 m².

Planning reference P19/336

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.