Commencement notice group
Housing commencement notices — Athenry
Athenry, Galway
3 separate notices · latest notified commencement 01 Feb 2022 · planning reference supplied
- Source notices
- 3
- Latest notified commencement
- 01 Feb 2022
- Latest notice
- 6 homes
- Planning references supplied
- 18/12
- Public location
- Athenry, Galway
Public source geography
Site location
- Public site / locality
- Athenry, Galway
- County
- Galway
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
Application details, the decision and any documents published by the authority are available in the official planning file.
-
Official planning file Application details, decision and available documents Galway County Council · reference 18/12 Official council planning portal checked 29 Jul 2026 Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Construction and completion of 6 No. houses connecting to previously constructed Phase 1 & Phase 2 of existing residential development. Consisting of construction of house type A no.33, 34, 63 & 68.Construction of house type D no. 35 & 36 and all associated site development works.
6 homes · 551 m² · stated on this notice
Construction and completion of 52 No. houses connecting to previously constructed Phase 1 of existing residential development. Consisting of full construction of house no.7 to 32, 37 to 56. Completion of house no. 57 to 62 and 64 to 67 on previously constructed raft foundation and all associated site development works.
52 homes · 5,124 m² · stated on this notice
Construction of Construction phase access with site clearance and Site development works in preparation for construction of housing development
1,000 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.