Site start
Housing site start — Newbridge
Newbridge, Kildare
1 commencement notice · start date 14 Jun 2016 · planning references given
Planning 14/739 (PL09.244106)
- Commencement notices
- 1
- Latest start date
- 14 Jun 2016
- Latest notice
- Scale not stated
- Planning references
- 14/739 · PL09.244106
- Location
- Newbridge, Kildare
Location
Where the site is
- Area
- Newbridge, Kildare
- County
- Kildare
No usable public source coordinate or reviewed official planning boundary is available for this notice group.
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Official source links are available below.
-
Official appeal case Appeal decision and documents Inspector's report, order, direction and meeting record for PL09.244106. An Coimisiún Pleanála Official link · not recently checked Exact official source shared from the planning and approval record.Open official appeal/SHD case · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Change of house type from previously approved single storey dwelling house as per condition 2 of Pl. Ref. No. 13/864 to single storey and storey and a half dwelling house and all associated site development works.
Source unit value with scope not stated: 1 house. It is not presented as notice-specific scale.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.