Site start
Building extension site start — Ranelagh
Ranelagh, Dublin
1 commencement notice · start date 07 Aug 2017 · planning reference given
Planning 2394/17
- Commencement notices
- 1
- Latest start date
- 07 Aug 2017
- Latest notice
- Scale not stated
- Planning reference
- 2394/17
- Location
- Ranelagh, Dublin
Location
Where the site is
- Area
- Ranelagh, Dublin
- County
- Dublin
Addresses on the notices
- attic level and insulation to the roof at attic level
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
General restoration and decoration works to semi- detached 3-storey protected structure; single storey extension to the side and alterations to the rear & side fenestration; external modifications to include repointing the brick façades, refurbishment of existing windows and doors, replacement of the window in the front dormer to match existing, replacement of the glazed roof canopy to the side passage, new rooflights to the side extension roof; internal modifications to the existing layout to include a new shower room at attic level and insulation to the roof at attic level; & all associated site works.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.