Site start

Site start — Ballacolla

Ballacolla, Laois

1 commencement notice · start date 25 Sep 2014 · no planning reference given

Planning 1497 · Council file · external

Commencement notices
1
Latest start date
25 Sep 2014
Latest notice
31 m²
Planning references
None given
Location
Ballacolla, Laois

Location

Where the site is

Area
Ballacolla, Laois
County
Laois
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

No planning reference is supplied for this notice group.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion.

Notice 1 Commencement notice (owner-supplied)

alter previously granted permission, Laois County Council Planning Permission Ref. no. 11/331 & subsequent Board Pleanala Ref. No. PL11.240927; the alterations are to include: 1. Changes to Granted Shop, Restaurant, and facilities building to include enlargement of footprint (by 31sq.m) to aid compliance with Building regulations; 2. building elevation changes; 3. changes to the granted main canopy; with all associated site development works

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 31 m².

Source unit value with scope not stated: 1 unit. It is not presented as notice-specific scale.

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.