Site start

Building extension site start — Dun Laoghaire

Dun Laoghaire, Dublin

1 commencement notice · start date 08 Apr 2024 · planning reference given

Planning D23A/0639 · Planning application

View full project timeline

Commencement notices
1
Latest start date
08 Apr 2024
Latest notice
1 unit
Planning reference
D23A/0639
Location
Dun Laoghaire, Dublin

Location

Where the site is

Area
Dun Laoghaire, Dublin
County
Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

Construction of new rear single storey extension at Upper Ground Floor level, internal alterations and refurbishment work, demolition of rear garage and provision of new boundary wall with vehicular access gate

Work stated for this notice 1 unit Explicit phase quantity stated by the source.

Floor area stated for this source: 275 m².

Planning reference D23A/0639

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.