Site start
Site start — Dublin
Dublin
1 commencement notice · start date 29 Aug 2024 · planning reference given
Planning 5061/23 · Planning application
- Commencement notices
- 1
- Latest start date
- 29 Aug 2024
- Latest notice
- 5,740 m²
- Planning reference
- 5061/23
- Location
- 162 Capel Street, Dublin
Location
Where the site is
- Area
- Dublin
- County
- Dublin
Addresses on the notices
- 162 Capel Street, Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Provision of a 105 key aparthotel with 7 floors above ground floor and basement including the refurbishment and connection of the existing 3 storey building at 162 Capel Street. The development will provide a bar and restaurant space at ground floor along with guest amenities as well as spa and gym facilities at basement level along with storage and staff changing facilities
Floor area stated for this source: 5,740 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.