Site start
Housing site start — Dublin
Dublin
1 commencement notice · start date 20 Nov 2026 · planning reference given
Planning D26A/0013/WEB · Planning application · Council file · external
- Commencement notices
- 1
- Latest start date
- 20 Nov 2026
- Latest notice
- 1 house
- Planning reference
- D26A/0013/WEB
- Location
- Dublin
Location
Where the site is
- Area
- Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The proposed development consists of A) The demolition of existing single storey rear and side sunroom extensions and small attached shed/outbuilding, the demolition of associated single storey garage building; to enable B) The construction of a two-storey extension to the eastern, northern and western elevations of the existing house, with single storey extensions to the western and southern elevations, fenestration changes to all elevations, with associated dormer windows (to the northern elevation) and rooflights, together with an increase in ridge height to facilitate first-floor. C) The construction of a single storey ancillary, non-habitable garden room. D) The widening of the existing front vehicular entrance from 2.74m to 3.45m; and, E) All associated site development works, associated drainage, landscaping, and ancillary works to facilitate the development.
Floor area stated for this source: 367 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.