PlanningBrief · Supplier outreach brief

Housing commencement notices — Knockatee

Knockatee, Dublin · Fingal County Council

QR code for this project brief Scan to share this brief
Publication rank
9 of 10
Notice events
6
Latest commencement
10 Jun 2026
Largest stated units
166
Largest stated floor area
8427 m²

Scope boundary: This record remains its own commencement notice group because no shared planning-reference context is available. The grouping does not establish construction progress or completion. This is a commencement notice group, not a canonical scheme. Each notice remains a separate event. Largest single notice-stated value in the reviewed group. Notice values are not summed and are not presented as whole-scheme scale.

Official planning material

Drawings index

Architecture drawings

Site layout and masterplan

Phasing plan

House-type plans

Engineering and drainage

Landscape plans

  • Tree Survey Exact official document hub · Open exact official document index
  • Landscape Exact official document hub · Open exact official document index

Event-level evidence

Commencement story

  • CN0148313FL 01 Oct 2026 · 75 houses · Commencement notice

    Phase 3 consisting of 75 No. houses comprising of:24 No. two bedroom houses, 47 No. three bedroom houses and 4 No. four bedroom houses. These range in height from two to three store and include semi-detached and terraced houses.

  • SN0014796FL 11 Sep 2026 · 42 units · Commencement notice

    Construction of Block 11, a Four Storey (Ground plus 3) residential block located off Holybanks Avenue on a site accessed from Glen Ellan Road, Swords, County Dublin. Ground Floor contains ancillary sprinkler plant and water storage area

  • SN0014400FL 26 Jun 2026 · 52 units · Commencement notice

    Construction of Block 3, a Five Storey (Ground plus 4) residential block located off Holybanks Place on a site accessed from Glen Ellan Road, Swords, County Dublin. Ground Floor contains Ancillary Bike storage / Plant use.

  • SN0014307FL 10 Jun 2026 · 52 units · Commencement notice

    Construction of Block 2, a Five Storey (Ground plus 4) residential block located of Holybanks Place on a site accessed from Glen Ellan Road, Swords, County Dublin. Ground Floor contains Ancillary Bike storage / Plant use.

  • SN0014170FL 13 May 2026 · 38 units · Commencement notice

    Construction of Block 1, a Five Storey (Ground plus 4) residential block located of Holybanks Boulevard on a site accessed from Glen Ellan Road, Swords, County Dublin. Ground Floor contains a Ancillary Bike storage / Plant use.

  • SN0014089FL 27 Apr 2026 · 27 units · Commencement notice

    Construction of Block 5, a Four Storey (Ground plus 3) residential block located between Holybanks Drive and Holybanks Place on a site accessed from Glen Ellan Road, Swords, County Dublin. Ground Floor contains a community use which will be completed to shell and core standard.

  • CN0141585FL 27 Apr 2026 · 1,881 m² · Commencement notice (owner-supplied)

    Phase 2 consisting of 16 No. back-to- back Townhouses comprising of: 16 No. three bedroom three storey houses.

  • SN0014010FL 08 Apr 2026 · 27 units · Commencement notice

    Construction of Block 4, a Four Storey (Ground plus 3) residential block located between Holybanks Drive and Holybanks Place Accessed from Glen Ellan Road, Swords, County Dublin. Block 04 will comprise of 27 no. residential apartment units. The building has a communal secure bicycle store at ground floor level. A Meter Room and Plant room are also located at ground floor level. The Retail Space and Creche will be completed to a shell finish. The Retail Space and Creche fit out will completed under a separate Commencement Notice.

  • CN0137143FL 05 Jan 2026 · 8,427 m² · Commencement notice (owner-supplied)

    Phase 1a consisting of 75 No. houses comprising of: 4 No. two bedroom houses, 54 No. three bedroom houses and 17 No. four bedroom houses These range in height from two to three store and include semi- detached and terraced houses.

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

PlanningBrief branding is neutral. No project organisation is presented as a customer, partner, endorser or appointed supplier.