Site start

Housing site start — Santry

Santry, Dublin

1 commencement notice · start date 20 Jan 2020 · planning reference given

Planning 1158/18

Commencement notices
1
Latest start date
20 Jan 2020
Latest notice
1 house
Planning reference
1158/18
Location
Santry, Dublin

Location

Where the site is

Area
Santry, Dublin
County
Dublin
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

Use the planning reference with the official register or the PlanningBrief council overview below.

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

Notice 1 Commencement notice

construction of a new two storey extension with rooflight to the side, a new single storey extension with rooflight to the rear and a single storey extension to the front of the existing semidetached dwelling house as well as widening the entrance gate to 3.5m together with all related internal alterations and all associated sitework.

Work stated for this notice 1 house Explicit phase quantity stated by the source.

Floor area stated for this source: 70 m².

Planning reference 1158/18

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.