Site start
Housing site start — Dublin
Dublin 4, Dublin
1 commencement notice · start date 20 Apr 2018 · planning reference given
Planning 3852/17
- Commencement notices
- 1
- Latest start date
- 20 Apr 2018
- Latest notice
- Scale not stated
- Planning reference
- 3852/17
- Location
- Dublin 4, Dublin
Location
Where the site is
- Area
- Dublin 4, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
removal of the existing dilapidated single storey conservatory to the rear and the construction of a part 2 storey, part single storey extension to the rear with associated roof lights. The reconfiguration of the internal layout and full refurbishment of the existing 2 storey house with all associated works and new roof lights. New railings to the front steps to provide safe access to the house. All associated site works, drainage and landscaping.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.