Commencement notice group
Housing commencement notices — Curravough South
Curravough South, Kerry
1 separate notice · latest notified commencement 11 Aug 2025 · planning reference supplied
- Source notices
- 1
- Latest notified commencement
- 11 Aug 2025
- Latest notice
- 1 home
- Planning references supplied
- 24/60320
- Public location
- Curravough South, Kerry
Public source geography
Site location
- Public site / locality
- Curravough South, Kerry
- County
- Kerry
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Project documents
Drawings & planning documents
The exact official planning file is available below.
-
Official planning file Application details, decision and available documents Kerry County Council · reference 24/60320 Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.Open official planning file · external
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
alteration and extension to family home to include separate living accommodation / ‘Granny Flat’, with all associated site works including the decommissioning of the existing sewage treatment system and installation of a mechanical treatment unit and polishing filter
1 home · 203 m² · stated on this notice
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.