Site start
Housing site start — Dublin
Dublin 9, Dublin
1 commencement notice · start date 22 Jul 2019 · planning reference given
Planning 2567/19 · Planning application
- Commencement notices
- 1
- Latest start date
- 22 Jul 2019
- Latest notice
- 9 m²
- Planning reference
- 2567/19
- Location
- Dublin 9, Dublin
Location
Where the site is
- Area
- Dublin 9, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
The development will consist of the following: (A) To carry out alterations to the existing ground floor layout of the dwelling to include alterations to the rear external door and window openings. (B) To construct a two storied extension over the existing rear extension and to include alterations to the first floor layout which will include a shower room and a new roof-light to the existing roof. (C) To replace existing windows and door to the front of the house with new ones. (D) All ancillary site development works.
Floor area stated for this source: 9 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.