Site start
Site start — Dublin
Dublin
1 commencement notice · start date 20 Jan 2023 · planning references given
Planning D18A/0078 & D19A/0947
- Commencement notices
- 1
- Latest start date
- 20 Jan 2023
- Latest notice
- 6,347 m²
- Planning references
- D18A/0078 · D19A/0947
- Location
- Harbour Road, Dublin
Location
Where the site is
- Area
- Dublin
- County
- Dublin
Addresses on the notices
- Harbour Road, Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Change-of-use to offices with food court & material alterations to existing Ferry Terminal, Harbour Rd, Dun Laoghaire, Co. Dublin excluding consideration of existing building elements such as existing super-structures, sub-structures, building components, materials, assemblies, constructions, building services or below-and-above-ground wastes and drains relative to their compliance with current Building Regulations as they apply to said change-of-use, where an adequate assessment of the compliance of such existing building elements is not reasonably practicable.
Floor area stated for this source: 6,347 m².
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.