Housing site start — Dunlaoghaire
Dunlaoghaire, Dublin
1 commencement notice · start date 04 Apr 2025 · planning references given
Planning D15A/0083/E D15A/0083
- Commencement notices
- 1
- Latest start date
- 04 Apr 2025
- Latest notice
- Scale not stated
- Planning references
- D15A/0083 · D15A/0083/E
- Location
- Dunlaoghaire, Dublin
Location
Where the site is
- Area
- Dunlaoghaire, Dublin
- County
- Dublin
- Approximate commencement source point
Source meaning
What the commencement source confirms
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.
Dates, scale and organisations below stay attached to the individual notice that supplied them.
Official sources
Official planning documents
Use the planning reference with the official register or the PlanningBrief council overview below.
These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.
Chronological source evidence
Commencement notice timeline
These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.
Extension and renovation to existing dwelling house to include: demolish existing porch construct extensions, construct new balconies at first floor level, internal modifications to windows and doors, new roof lights to rear, raise existing south boundary wall at front to a level of existing timber fence, provide new sliding gate and associate works to front entrance.
A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.