Commencement notice group

Building extension commencement notices — Clongeen

Clongeen, Wexford

1 unique commencement event · latest notified commencement 08 Nov 2019 · planning reference supplied

View full project timeline

Unique commencement events
1
Latest notified commencement
08 Nov 2019
Latest notice
375 m²
Planning references supplied
20180658
Public location
Clongeen, Wexford

Verified record connections

Planning, start and completion evidence

Exact planning records
1
Official record actions
1
Explicit planning relationships
0
Duplicate source rows consolidated
1
Exact completion events
1
  1. Completion certificate recorded — source scope not stated Wexford County Council · commencement CN0060313WX Certificate CC00000028955WX · First observed in the official monthly source 2019-11 1 units stated for this certificate · One certificate representation

Planning, commencement and completion remain separate exact-source events. Dated certificates are linked by their official notice reference and authority to the associated commencement history; notice quantities are never added into a project total.

Planning-anchored public geography

Site identity and location

Canonical public locality
Clongeen, Wexford
County
Wexford
Approximate commencement source point. Use the source links if the inline map is unavailable.
  • Approximate commencement source point
Approximate source location from the commencement record; not an official site boundary.

Source meaning

What the commencement source confirms

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed.

Dates, scale and organisations below stay attached to the individual notice that supplied them.

Official sources

Official planning documents

The exact official planning file is available below.

  • Official planning file Wexford County Council planning record Application details, status and decision record for 20180658. Official council planning portal Official link · not recently checked Exact normalized planning authority and local planning reference in the indexed official planning record.
    Open official planning file · external

These links are source-backed navigation. The notice-supplied planning reference remains separate from any verified canonical planning relationship.

Chronological source evidence

Commencement notice timeline

These records are grouped because they share the same planning authority and supplied planning-reference context. Each notice remains separate evidence; the grouping does not establish overall scheme scale, construction progress or completion.

CN0060313WX BCMS owner-supplied export

The proposed demolition of the existing toilet block, meeting room and store to the rear of the existing building and replacing this demolished area with new toilet facilities and new meeting room, the proposed erection of extensions to the building consisting of new stage extension and reception area together with proposed alterations to the north (front) elevation of the existing Parish Hall building

Work stated for this notice Scale not stated for this notice.

Floor area stated for this source: 375 m².

Planning reference 20180658 Builder stated: Mythen Construction Ltd

A commencement notice records a declared building-control commencement date. It does not by itself confirm that every permitted work began or was completed. Future verified planning enrichment can be added to this record without changing its notice evidence.